1. <sub id="m4fws"><listing id="m4fws"></listing></sub>
      <wbr id="m4fws"></wbr>

        <sub id="m4fws"><listing id="m4fws"></listing></sub>
      1. <form id="m4fws"></form>
        <nav id="m4fws"><listing id="m4fws"></listing></nav>

        BRC Historical Photos

        2005 - BRC evaporation pond prior to remediation.
        2005 - BRC evaporation pond prior to remediation.
        2007 - Layering of disposal pond and underlying soil exposed during excavation activities to remediate a typical evaporation pond.
        2007 - Layering of disposal pond and underlying soil exposed during excavation activities to remediate a typical evaporation pond.
        2015 - BRC CAMU (engineered and permitted landfill) containing remediation material from former BMI evaporation ponds.  View is from the Warm Springs Road entrance.
        2015 - BRC CAMU (engineered and permitted landfill) containing remediation material from former BMI evaporation ponds.  View is from the Warm Springs Road entrance.
        2016 - Typical CAMU details; sloped cover material, stormwater control, concrete run-off channel, and leachate sump/monitoring equipment.
        2016 - Typical CAMU details; sloped cover material, stormwater control, concrete run-off channel, and leachate sump/monitoring equipment.
        2016 - Example of abandoned effluent disposal line (was routed to former evaporation ponds) being removed from BRC property.
        2016 - Example of abandoned effluent disposal line (was routed to former evaporation ponds) being removed from BRC property.

        Newsletter Signup: Water Pollution

        Success! Thank you for signing up. Check your email to complete your subscription.

        什么麻将可以上下分